COFFEY BUILDING GROUP PROJECTS
10th & O (3).jpg
10th & O Street Office Building

Sacramento, CA - to be completed Spring 2021

 

Description: 472,000 Sq foot 10 story DGS office building for the California State Legislature, including 4 assembly rooms with acousitbuilt ceilings.  

Cost of Construction:  $432,000,000

General Contractor: Hensel Phelps Construction Co. 

Scopes of Work:  Metal Stud Framing, Drywall, Building Insulation, and Firesafing

Special Highlights: The Coffey Building Group team provided budgeting, preconstruction/design assist services, engineering of the interior/exterior cold formed steel framing, 3D BIM  modeling and value engineering. 

Folsom Lake College Gymnasium

Folsom, CA - 

 

Description: Metal stud and structural steel framed building with exterior waterproofing management system

Cost of Construction:  $14,000,000

General Contractor: Flintco

Scopes of Work:  Metal Stud Framing, Drywall, and Waterproof Exterior Management Systems

Special Highlights: Our project team assisted with budgets through design to completion keeping the project within budget. We aided in Value Engineering design for the exterior water management system.

Stairwell_ceiling.jpg
Adventist Shared Services Campus

Sacramento, CA

 

Description: New five-story 275,000sq commercial headquarters for Adventist Health.

Cost of Construction:  $160,000,000

General Contractor: Swinerton

Scopes of Work:  Metal stud, Drywall, DIRTT Demountable Partitions,Tape Finish, Insulation and Acoustical Finishes

Special Highlights: The CBG team provided a unique, three dimensional, metal framed substructure which was clad with custom wood panels at the Vertical Circulation Mission Stair featured in the lobby entrance. 

NNRH_North_Per2.jpg
New Natural Resources Headquarters

Sacramento, CA

 

Description: New headquarters for the Water Resources, Fish & Game, Forestry and Fire protections, Conservation Agencies and Natural Resources

Cost of Construction:  $600,000,000  

General Contractor: Turner Construction Company

Scopes of Work:  Acoustical and Specialty Ceilings

Special Highlights: CBG provided budget assistance with the original project design. This project features unique specialty finishes such as PET recycled felt baffle ceilings, and custom metal ceiling panel systems with integrated chilled beam climate control. 

SJA rendering.jpg
San Jose State University Aquatic Center

San Jose, CA

 

Description: 121,000 sf two-story contemporary design-build facility for fitness classes, sporting events, aquatics, rock climbing and four gymnasiums. 

Cost of Construction:  $130,000,000

General Contractor:  Hunt Construction Group, Inc. 

Scopes of Work: Metal Stud Framing, Lath, Plaster, Insulation, and Fireproofing

Special Highlights: The CBG project team provided design-assist and value engineering services.  The project has many architectural design features including large coffered ceilings, architectural Texston plaster exterior and serpentine exterior soffits.   

Sheldon
Sheldon Academy of Innovative Learning

Fairfield, CA

 

Description: Modernization of 12,000 sq ft of existing administration space and classrooms, kitchen expansion, and construction of a new library, and 11,000 sq ft 2 story classroom building. 

Cost of Construction:  $36,000,000

General Contractor:  XL Construction

Scopes of Work: Metal Stud Framing, Gypsum Assemblies, HOW Firestopping and Sealants

Special Highlights: CBG performed installation of the load bearing structural cold formed steel framing, conducted in 2 increments.

sawyer-1501880637.jpg
Sacramento Downtown Plaza Hotel

Sacramento, CA

​

Description: 16 Story 250 Room Hotel tower with 50 Luxury Condos and 45,000 sf retail space located in the new Sacramento Downtown Commons Complex

Cost of Construction:  $190,000,000

General Contractor: Swinerton

Scopes of Work: Metal Stud Framing, Drywall, Taping, EIFS, DEFS, Plaster, Insulation and Acoustical Finishes

Special Highlights: Our project team designed and engineered the exterior metal stud framing on this project. 

0FE0C036-205E-4FF9-A4A1-023C5264B11Crop2
Modoc Medical Replacement Hospital

Alturas, CA

​

Description: Construction of brand new hospital for Modoc County

Cost of Construction:  $46,500,000

General Contractor: Swinerton

Scopes of Work: Metal Stud Framing, Drywall, Drywall Finishing, Acoustical Ceilings, and Specialty Wood Ceilings

Special Highlights: CBG partnered with Swinerton Builders and NM&R Architects on the design-build team to provide a turn-key replacement hospital for Modoc County. CBG provided preconstruction services including budgeting, constructability, design collaboration and coordination, and engineering.